RTOC (Real Time Operating Center) Coordinator
Location | Kampala, Uganda |
Date Posted | October 23, 2023 |
Category | Management Oil & Gas |
Job Type | Contract |
Currency | UGX |
Description

About the job
Profil du candidat
Qualifications & Experience:
- MSc (or equivalent professional experience) and academic training in drilling & wells. Good operational knowledge of the Oil & Gas industry.
- Minimum 5 years of experience in in Drilling and Wells operations or engineering. With Minimum 2 years as a drilling engineer is preferred.
- Good knowledge of Company policy and procedures (drilling, testing, safety/environment).
- Use of drilling design software (T-desk/ADEPT, Third party software is a plus (trajectory, Anti-collision.))
- Driven, good team spirit and communication skills (written and verbal).
Activités
Main Duties and Responsibilities:
Data aggregation and transfer
- Work with the RTOC service provider and IT department to set up data aggregation from the different Service companies at the 3 Rig Sites, data transfer protocols and the RTOC installation at Kampala office.
- Ensure data transfer quality control at all time during operations and support the RTOC service provider to troubleshoot any issue.
Well planning
- Provide Drilling engineers before upcoming operations with offset wells review dossier that includes analysis and visualization of major drilling / formation hazards, Lessons learned, drill bit/BHA performances.
- Prepare well monitoring strategy with D&W engineers: Organize a kick-off meeting, define the drilling parameters envelopes, alert levels, Issue communication protocols, vigilance points and make sure relevant KPIs are agreed and implemented.
During operations
- Ensure process is known & applied with rig sites, define documents to be shared with rig site and communicate same with regular follow-up.
- Ensure operations follow-up and communicate any deviation as per communication protocol. Prepare all supporting data displays for decision making during briefings between Town and the Rig Site.
- Ensure that all incidents captured through the RTOC are investigated, corrective actions are completed, and lessons learned are shared.
- Closely monitor KPIs to evaluate the effectiveness of the recent operational activities. Highlight any deviation from KPI targets to drive continuous improvement.
- Ensure daily reporting is shared on time and with the agreed templates.
- Highly contribute to métier digital transformation, work with the HQ DrillX to install & develop products such as predictive models and propose continuous improvement of the RTOC.
Post Well operations
- Organize the preparation of end-of-phase report with the relevant recommendations for improvement.
Business Continuity Plan
- Due to high frequency of well delivery and short well duration, the RTOC Coordinator shall be able to stand for drilling engineers for trajectories processing (Anti-collision monitoring, drain landing, Geosteering).
Contexte et environnement
A Green Field Project, the Tilenga field is to be found in a remote location in UGANDA near lake Albert with particularly sensitive environmental conditions. A challenging project; heavy and waxy oils produced from 31 drilling pads, (with some of them located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bld of water treatment capacity. Reservoir pressure maintenance is ensured either by water injection or by polymer water injection depending on the reservoirs characteristics. The project also includes an extended interconnecting network with temperature preservation. Multicultural environment: Contractors are anticipated to be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as International codes for onshore plant will apply.